How many Projects do you work on at one time?

theCodeMonsterstheCodeMonsters Member Posts: 359
edited May 2012 in Working with GS (Mac)

Comments

  • Braydon_SFXBraydon_SFX Member, Sous Chef, Bowlboy Sidekick Posts: 9,273
    I only work on one project at a time. However, before I really start "Working" on that project, I might "start" another project. :P Those projects will be completed, but not while I'm really "working" on a project.


    Braydon
  • patapplepatapple Member Posts: 873
    i know that it is not right but i have continously new game ideas :)
  • theCodeMonsterstheCodeMonsters Member Posts: 359
    @Braydon_SFX Me too, I usually start 2 or 3 projects. Work on them equally till one becomes more fun. Then I'll focus on that one till it's done and once it is, I'll go and work on another.
  • MarkOnTheIronMarkOnTheIron Member Posts: 1,447
    You forgot to add the "Too many" option in the list :)

    I have at least 10 projects that I started that are waiting for further inspiration or some GS features. Then I have 2 side project and 2 main ones (one is mine and one is for a client) that are actively in working mode. It really takes its toll on mental sanity 8-}

  • NettekovenGamesNettekovenGames Member Posts: 88
    Enough for ME since i'm still a beginner and learning alot and making more then 1 would only confuse me
  • IsabelleKIsabelleK Member, Sous Chef Posts: 2,807
    I work only on one project at time, it's quicker, and more effective, in my opinion.
  • EatingMyHatEatingMyHat Member Posts: 1,246
    In my opinion, good results need focus and love :)
  • SingleSparqSingleSparq Member Posts: 1,339
    Bad habit of starting one and then another idea hits. Hardest part about any developing is finishing a project.
  • crazycam99crazycam99 Paris, FranceMember Posts: 519
    I normaly work on 1 to 4 projects at a time.
  • SinSquidSinSquid Member, PRO Posts: 135
    Right now, im working on 3 projects. Im always having new ideas, so I realy should have more :) Consentrating very hard on one of them theese days, will finish it and then I´ll continue the others.
  • bazookaBenbazookaBen Member Posts: 318
    1 project. 5 days max.
  • blondonblondon Member Posts: 31
    Working on 1.. But I built a basic prototype of another I'm dying to get too!
  • jonmulcahyjonmulcahy Member, Sous Chef Posts: 10,408
    Working on 1
    1 on back burner till lua free engine
    2 sequels in artwork
    1 design doc in writing
    4 planned ideas
  • beefy_clyrobeefy_clyro Member Posts: 5,394
    I tend to work on about 3. Having tried seeing a project through from start to finish, the last 10% is the hardest. Enthusiasm wains and theres a tendency imo to rush! I find by working on a couple of projects, as I start to tire of 1 project, if i work on another it gives me that new game buzz again, as there wares off i go to another or back to my original and it all feels fresh again. It also breaks me from tunnel vision, it allows me to think of new ideas and see flaws I previously couldn't see.
  • jckmcgrawjckmcgraw Member Posts: 647
    I usually have a main project and a side project. When I'm "in the zone", I will only focus on one of them.
Sign In or Register to comment.